I would look at the bank of four 6800uF 63V, two 2200uF 16V and the two 100uF 63V on the left hand side where the connector from the transformer plugs into the board. This is just a guess.

Why not while the board is removed change all the electrolytics? If you think some have gone dry, remember they were all installed at the same time.


Lounge: DSP5200, 518
Snug: DSP33 x 5, C61R, HD621
Office: M33